€33bn worth of contracts waiting to be awarded in the power engineering market in Poland

The power engineering segment is currently the only way for the construction industry to overcome the slowdown and a remedy to the falling number of investment projects in the road construction sector. Projects valued at PLN 2.6bn (€600m) are currently underway, while contracts totalling PLN 17bn (€4bn) have been awarded and are about to enter the construction phase soon.
In 2010-2011, the conventional power sector was meticulously preparing power projects and launching tender procedures concerning the implementation of tasks improving efficiency of power plants and CHP plants. The first effects of these efforts can be seen in 2012. According to our latest report entitled “Power sector construction in Poland 2012 – Development forecasts and planned investments“, several medium-sized projects with the aggregate capacity of nearly 500 MW and worth almost PLN 2.6bn (€600m) are currently in the construction phase.

Sign up now to open the complete market analysis.

You may open an unlimited number of analyses accessible from PMR websites.
  • 1E-mail
    (to send requested information)
  • 2Brief profile
    (required for new e-mails only)

 required fields

You must accept PMR’s Privacy Policy.